We can start with receiving inspection at the rail siding, port of entry, substation site or wherever the unit is located, and then assemble all parts that were removed for shipment to make the transformer operational.
If the unit was shipped oil-filled and the oil level needs to be lowered to install bushings or other parts, Emaar Electricals can get it done.
Emaar Electricals can arrange for oil tank trucks to be on-site for oil storage or hauling, and we can bring in one of our many oil processing rigs.
Using your specifications, the transformer manufacturer’s specifications or ours, our Service Team can vacuum degasify and prepare new oil for installation, pull vacuum on the transformer and professionally complete the vacuum oil-filling process